青青青青青免精品视频_免费现黄频在线观看国产1_欧美人妻性爱中文字幕不卡视频_最近2024中文字幕视频_欧美日韩亚洲综合一区二区三区_人妻中文字幕不卡无码_久久久久久青草大香综合精品_91视频黄片视频免费看_黄色网址在线观看免费_亚洲日本一区二区三区在线不卡,精品尤物国产尤物在线看蜜臀,掀开超短裙老师的裙子挺进去,男人狂躁女人高潮野战久久网

Welcome to the official website of Zhucheng Luxin Yida Machinery Technology Co., Ltd,!

Zhucheng Luxin Yida Machinery Technology Co., Ltd



服務(wù)電話Service telephone 15762524111
Service telephone

15762524111

Points for attention in pig scalding pool

Source: Time:2020-12-28 16:35:48 views:

The pig scalding pool is made of stainless steel with thickened inside. Using 304 seamless heating tube, the heating effect is not easy to damage. The size of the pool can be customized according to the number of processing objects and the number of one-time delivery, and the power used depends on the size of the pool. The premise is to make sure that the power of the cable in the place where the scalding pool is used can reach the bearing capacity and above,

The pig scalding pool is made of stainless steel with thickened inside. Using 304 seamless heating tube, the heating effect is not easy to damage. The size of the pool can be customized according to the number of processing objects and the number of one-time delivery, and the power used depends on the size of the pool. The premise is to make sure that the power of the cable in the place where the scalding pool is used can reach the bearing capacity and above, so as to prevent the occurrence of electric danger.

Precautions for pig scalding pool:

1. Before using the equipment, please reconfirm that the power of your customized ironing pool is consistent with the square number of cables in your field, and can't be lower than the square number of the required ironing pool.

2. Before using the ironing bath, please tighten the wiring parts again to prevent bumping during transportation and loosening the joint.

3. After all confirmed, add water to the scalding pool, submerge the heating tube, and do not let the heating tube dry burn. It is tap water or light water to prevent scale from growing too fast and damaging the heating pipe.

4. It is suggested that the scalding pool should be cleaned and nursed after killing pigs every day, especially the heating tube, and the scale should be removed with a small brush to prolong the service life.

5. Hot pool distribution box has a heating tube and two heating tubes, two heating tubes can be opened at the same time, or one can be opened after heating for heat preservation, which is convenient to save electricity.

6. There is a time regulator in the power distribution box. Set the time regulator to start heating at a certain time every day. Later, it will remember the time and heat on time. Instructions are enclosed.

7. The distribution box has a temperature control instrument panel, which usually displays the real-time temperature. When the "set" key is pressed, it is used to adjust the temperature to be heated Key means to raise the temperature to be heated, and key means to lower the temperature to be heated. After setting, press the "set" key again to complete the operation.

Previous:Already the first article

Next:Operation points of vertical pig washing machine

Return

Copyright © ZHUCHENG LUXIN YIDA MACHINERY TECHNOLOGY CO., LTD All rights reserved

Website record number:LU ICPkeep on record NO.2021007238-1